A cement plant located at Riyadh Saudi Arabia with Captive power plant generating 34 Mwe of power @ 11 KV / 60 HZ .
In order to meet the shortage of power evidenced due to the expansion project, the management decided to opt for the LFO based 2 X 2.5 MWE power plant and ordered the same from UNIDAAN FZ LLC.
UNIDAAN FZ LLC , Located at Dubai sourced the generators from DLD China and assigned the electrical and Instrumentation system supply to GPCE.